ClientEPDC – U-line Cross Europe Pipeline
LocationMainland Europe
DescriptionWork on this utilities based project was undertaken over an eighteen-month pre-sanction period with thyssenkrupp Industrial Solutions Oil & Gas supporting the client organisation in their structure and provision of procurement support services to augment areas where the contractor organisation had been identified as weak. This arrangement allowed the client to concentrate on the key issues of managing the authorities, financial institutions and government bodies and other stakeholders.

Read the full case study

ClientPENSPEN – Flare and Vent Design
LocationLibya
DescriptionDesign of flare and vent systems of a gas pipeline development and associated Compressor Station for Zuetina Oil Company, Libya.

Read the full case study

ClientMITSUI – Tunisian Power Station
LocationTunisia
DescriptionFEED study work for 300MW open cycle power station in Tunisia, gas reception facilities and interconnecting pipeline on accelerated schedule. The power plant consisted of 7 aero-derivative gas turbine generators equipped with inlet air chilling equipment.

Read the full case study

ClientBHP BILLITON – Angostura Oil Platform Engineering
LocationTrinidad
DescriptionField development and process support to offshore development throughout lifecycle. Option selection process review and development of full production chemistry premise for facility. Development of models for process and ongoing option selection studies of near-lying reserves.

Read the full case study

ClientEON – KRK LNG Import Terminal
LocationCroatia
DescriptionEON contracted thyssenkrupp Industrial Solutions Oil & Gas to perform an electrical power supply study from the Croatian Grid.

Read the full case study

ClientDRAGON LNG – Site Support Engineering Services
LocationOnshore, UK
Descriptionthyssenkrupp Industrial Solutions Oil & Gas has undertaken three separate scopes of work for Dragon LNG and currently works under a Framework Agreement.

Read the full case study

ClientCARBON TRUST – Marine Energy Accelerator Project
LocationUK
Descriptionthyssenkrupp Industrial Solutions Oil & Gas was appointed under a framework agreement to assist marine energy developers in Strand C of the Carbon Trust’s Marine Energy Accelerator project. Under this initiative the Carbon Trust seeks to speed the advance and development of offshore marine power generation technologies by funding the involvement of specialists to supplement developers’ in-house expertise.