Client | ALKANE ENERGY – Biomass Power | Location | UK | Description | Based upon an available 400-500 tonnes of dry “feed” per week, thyssenkrupp Industrial Solutions Oil & Gas reviewed the potential options including pyrolysis, gasification, anaerobic digestion and combustion/incineration. Capital costs, reliability, proven installed technology, size of footprint and capacity of power generated were considered for each option. Read the full case study |
|
 |